Hegins substation interconnection queue

1 active project totalling 10.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
10.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
T37 Hegins n/r 30 Wind Withdrawn
S40 Commonwealth LF n/r 10.5 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.