Eldred substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 6 with terminal status (shown grayed).
6 PJM queue filings name Eldred as the point of interconnection, all in Schuylkill County, PA.
Target commercial operation dates as filed run from Nov 2006 to Jan 2033 (6 filings).
Transmission owner as filed: PPL (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Q89 | Eldred 230kV | 230 | 750 | Coal | Withdrawn | Aug 2012 |
| C01-1198 | Eldred 230 kV | 230 | 715 | Gas | Withdrawn | Jan 2033 |
| U1-086 | Eldred 230kV | 230 | 150 | Other | Withdrawn | Jun 2010 |
| AE2-295 | Eldred 230 kV | 230 | 25.7 | Wind | Withdrawn | May 2022 |
| AG1-060 | Eldred 69 kV | 69 | 25.7 | Solar | Withdrawn | May 2022 |
| N50 | Eldred 230kV | 230 | 18 | Wind | Withdrawn | Nov 2006 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Eldred (PPL, 8 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Schuylkill County, PA
- Hegins: 1 active, 10.5 MW of 2 filed
- Pine Grove: 1 active, 8 MW of 2 filed
- Frackville-Hauto #3: 3 active, 7.1 MW of 3 filed
- Eldred-Pine Grove: 2 active, 4.3 MW of 2 filed
- Eldred-Frackville: none active of 3 filed
- Frackville: none active of 3 filed
- Frackville-Fishbach: none active of 2 filed
- Frackville-Siegfried: none active of 2 filed
- Port Carbon: none active of 2 filed