Bernville 2 substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-493 | Bernville 34.5 kV 2 | 34.5 | 12 | Solar | Withdrawn |
| AI2-459 | Bernville 34.5 kV 2 | 34.5 | 5.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.