Eldred-Frackville substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Q28 | Rausch Creek WF (68 WT) | 230 | 34 | Wind | Withdrawn |
| AD1-065 | Eldred-Frackville 230kV | 230 | 25.8 | Wind | Withdrawn |
| AB1-068 | Eldred-Frackville 230kV | 230 | 20 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.