S. Reading-Boyertown substation interconnection queue
2 active projects totalling 485 MW in the PJM queue.
2active projects
485active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA2-115 | Birdsboro Power LLC Generation Facility | 230 | 450 | Gas | In Service |
| AB2-112 | Birdsboro Power LLC Generation Facility | 230 | 35 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.