Bernville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AH1-492 Grand View Solar I 13 12 Solar Withdrawn
AD2-117 Bernville 69kV 69 7.7 Solar Withdrawn
AH1-061 Bernville 13.2kV 13.2 2.7 Solar Withdrawn
AF2-272 BR-Swissdale 13.2 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.