Morris substation interconnection queue
2 active projects totalling 32.6 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
32.6active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA1-040 | Morris Cogen | n/r | 20 | Gas | In Service |
| Y2-113 | Morris Cogen | 138 | 12.6 | Gas | In Service |
| V3-005 | Morris 34.5kV | 34.5 | 3.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.