Morris substation interconnection queue

2 active projects totalling 32.6 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
32.6active MW
3total filed
Queue IDProjectkVMWResourceStatus
AA1-040 Morris Cogen n/r 20 Gas In Service
Y2-113 Morris Cogen 138 12.6 Gas In Service
V3-005 Morris 34.5kV 34.5 3.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.