West Pemberton Solar
PJM queue ID W2-102
West Pemberton Solar (W2-102) is listed in the PJM interconnection queue as a 2.7 MW solar project in Burlington County, NJ. The filing names Mt. Holly as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2014.
| Queue ID | W2-102 |
|---|---|
| Project name | West Pemberton Solar |
| Status (as published) | In Service |
| Substation | Mt. Holly |
| Point of interconnection | Mt. Holly 26.4kV |
| County | Burlington |
| State | NJ |
| Voltage | 26.4 kV |
| Capacity | 2.7 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2014-06-30 |
| Source dataset | serial |
Same substation and county
Mt. Holly substation: 3 requests in the PJM queue, 1 active totaling 2.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| W2-087 | Mt. Holly 26kV | 3.8 | Solar | Withdrawn |
| X2-015 | Mt. Holly 26kV | 0 | Solar | Withdrawn |
Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 7 |
| MW capacity | 2.66 |
| MFO | 7 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.