Jacobstown III Solar Farm (X4-015) is listed in the PJM interconnection queue as a 1.9 MW solar project in Burlington County, NJ. The filing names Cookstown-Fort Dix as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2015.
| Queue ID | X4-015 |
|---|---|
| Project name | Jacobstown III Solar Farm |
| Status (as published) | In Service |
| Substation | Cookstown-Fort Dix |
| Point of interconnection | Cookstown-Fort Dix 34kV |
| County | Burlington |
| State | NJ |
| Voltage | 34 kV |
| Capacity | 1.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2015-09-30 |
| Source dataset | serial |
Same substation and county
Cookstown-Fort Dix substation: 3 requests in the PJM queue, 2 active totaling 4.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| W4-025 | North Run Solar | 2.6 | Solar | In Service |
| W2-089 | Cookstown-Fort Dix 34.5kV | 6.5 | Solar | Withdrawn |
Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 5 |
| MW capacity | 1.9 |
| MFO | 5 |