Twombley Road substation interconnection queue

1 active project totalling 20 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
20active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE1-076 Twombley Road 138 kV 138 20 Solar Withdrawn
AF1-331 Rochelle Solar n/r 20 Solar Engineering and Procurement

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.