Byron 345 kV
PJM queue ID AH1-702
Byron 345 kV (AH1-702) is listed in the PJM interconnection queue as a 43 MW nuclear project in Ogle County, IL. The filing names Byron as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2027.
| Queue ID | AH1-702 |
|---|---|
| Project name | Byron 345 kV |
| Status (as published) | Active |
| Substation | Byron |
| Point of interconnection | Byron 345 kV |
| County | Ogle |
| State | IL |
| Voltage | 345 kV |
| Capacity | 43 MW |
| Resource (as published) | Nuclear |
| Resource category | Nuclear (normalized for filtering) |
| Target commercial operation | 2027-06-01 |
| Source dataset | cycle |
Same substation and county
Byron substation: 3 requests in the PJM queue, 1 active totaling 43 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB1-121 | Byron 345kV | 1,927 | Not reported | Withdrawn |
| AG1-309 | Byron 345 kV | 0 | Not reported | Withdrawn |
Ogle, IL: 40 requests in the PJM queue, 15 active totaling 1,727 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Constellation Energy Generation, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 88.0 |
| MW capacity | 43.0 |
| MFO | 2530.0 |
| Submitted date | 4/7/2025 |
| Last updated | 8/26/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.