Twombly Road substation interconnection queue

1 active project totalling 15.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
15.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE1-199 Twombly Road 138 kV 138 20 Solar Withdrawn
AD1-013 Rochelle Solar 138 15.4 Solar Engineering and Procurement

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.