White Rock - Wayne substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name White Rock - Wayne as the point of interconnection, all in Ogle County, IL.
Target commercial operation dates as filed run from Dec 2025 to Oct 2029 (3 filings).
Transmission owner as filed: ComEd (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-146 | White Rock - Wayne 345 kV | 345 | 120 | Solar | Withdrawn | Oct 2029 |
| AH1-147 | White Rock - Wayne 345 kV | 345 | 120 | Solar | Withdrawn | Oct 2029 |
| AH1-148 | White Rock - Wayne 345 kV | 345 | 120 | Solar | Withdrawn | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Ogle County, IL
- BYRON - WEMPLETOW: 2 active, 463.6 MW of 2 filed
- Byron - Wayne: 1 active, 198.6 MW of 3 filed
- Byron: 1 active, 43 MW of 3 filed
- Rochelle: 3 active, 22 MW of 3 filed
- Twombley Road: 1 active, 20 MW of 2 filed
- Twombly Road: 1 active, 15.4 MW of 2 filed
- Stillman Valley: none active of 4 filed
- Maryland: none active of 3 filed
- Dixon-Cherry Valley: none active of 2 filed
- Lancaster-Maryland: none active of 2 filed