Maryland substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Maryland as the point of interconnection, all in Ogle County, IL.
Target commercial operation dates as filed run from May 2019 to Dec 2026 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-173 | Maryland 138 kV | 138 | 90 | Solar | Withdrawn | Dec 2026 |
| AD1-117 | Maryland 138 kV | 138 | 46.8 | Solar | Withdrawn | Jul 2020 |
| AC2-147 | Maryland | n/r | 7.6 | Solar | Withdrawn | May 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Ogle County, IL
- BYRON - WEMPLETOW: 2 active, 463.6 MW of 2 filed
- Byron - Wayne: 1 active, 198.6 MW of 3 filed
- Byron: 1 active, 43 MW of 3 filed
- Rochelle: 3 active, 22 MW of 3 filed
- Twombley Road: 1 active, 20 MW of 2 filed
- Twombly Road: 1 active, 15.4 MW of 2 filed
- Stillman Valley: none active of 4 filed
- White Rock - Wayne: none active of 3 filed
- Dixon-Cherry Valley: none active of 2 filed
- Lancaster-Maryland: none active of 2 filed