Stillman Valley substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| X1-087 | Orchard Hills Renewable Energy Station | n/r | 15.3 | Gas | Deactivated |
| AD1-096 | Stillman Valley 34 kV | 34 | 7.6 | Solar | Withdrawn |
| W3-132 | Stillman Valley | n/r | 7.4 | Solar | Withdrawn |
| W2-079 | Stillman Valley | n/r | 7.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.