Stillman Valley substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Stillman Valley as the point of interconnection, all in IL.
Target commercial operation dates as filed run from Mar 2011 to Dec 2018 (4 filings).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X1-087 | Orchard Hills Renewable Energy Station | n/r | 15.3 | Gas | Deactivated | Oct 2016 |
| AD1-096 | Stillman Valley 34 kV | 34 | 7.6 | Solar | Withdrawn | Dec 2018 |
| W3-132 | Stillman Valley | n/r | 7.4 | Solar | Withdrawn | Dec 2011 |
| W2-079 | Stillman Valley | n/r | 7.4 | Solar | Withdrawn | Mar 2011 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Ogle County, IL
- BYRON - WEMPLETOW: 2 active, 463.6 MW of 2 filed
- Byron - Wayne: 1 active, 198.6 MW of 3 filed
- Byron: 1 active, 43 MW of 3 filed
- Rochelle: 3 active, 22 MW of 3 filed
- Twombley Road: 1 active, 20 MW of 2 filed
- Twombly Road: 1 active, 15.4 MW of 2 filed
- Maryland: none active of 3 filed
- White Rock - Wayne: none active of 3 filed
- Dixon-Cherry Valley: none active of 2 filed
- Lancaster-Maryland: none active of 2 filed
Other PJM queue substations in Winnebago County, IL
- Wempletown: 2 active, 100 MW of 13 filed
- Rockford: 2 active, 60 MW of 2 filed
- Rockford II: 2 active, 27 MW of 3 filed
- Blackhawk: 1 active, 6.4 MW of 2 filed
- Sabrooke: 1 active, 6 MW of 2 filed
Site Scanner