Stillman Valley substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
X1-087 Orchard Hills Renewable Energy Station n/r 15.3 Gas Deactivated
AD1-096 Stillman Valley 34 kV 34 7.6 Solar Withdrawn
W3-132 Stillman Valley n/r 7.4 Solar Withdrawn
W2-079 Stillman Valley n/r 7.4 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.