Stillman Valley substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

4 PJM queue filings name Stillman Valley as the point of interconnection, all in IL.

Target commercial operation dates as filed run from Mar 2011 to Dec 2018 (4 filings).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
X1-087 Orchard Hills Renewable Energy Station n/r 15.3 Gas Deactivated Oct 2016
AD1-096 Stillman Valley 34 kV 34 7.6 Solar Withdrawn Dec 2018
W3-132 Stillman Valley n/r 7.4 Solar Withdrawn Dec 2011
W2-079 Stillman Valley n/r 7.4 Solar Withdrawn Mar 2011

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Ogle County, IL

All 40 PJM queue filings in Ogle County, IL.

Other PJM queue substations in Winnebago County, IL

All 28 PJM queue filings in Winnebago County, IL.