Seven Bridges Solar

PJM queue ID AD1-088

Seven Bridges Solar (AD1-088) is listed in the PJM interconnection queue as a 54 MW solar project in Mecklenburg County, VA. The filing names Briery-Clover as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 31, 2026.

Queue IDAD1-088
Project nameSeven Bridges Solar
Status (as published)Suspended
SubstationBriery-Clover
Point of interconnectionBriery-Clover 230 kV
CountyMecklenburg
StateVA
Voltage230 kV
Capacity54 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-12-31
Source datasetserial

Same substation and county

Briery-Clover substation: 6 requests in the PJM queue, 1 active totaling 54 MW.

Queue IDProjectMWResourceStatus
AC1-162Briery-Clover 230kV168.9SolarWithdrawn
AG1-176Briery-Clover 230 kV89.7SolarWithdrawn
AG1-098Finneywood Solar64.2SolarWithdrawn
AE2-182Seven Bridges Solar11.6SolarWithdrawn
AD2-200Briery-Clover 230 kV9.5SolarWithdrawn

Mecklenburg, VA: 61 requests in the PJM queue, 14 active totaling 990.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy80
MW capacity54
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.