Seven Bridges Solar
PJM queue ID AD1-088
Seven Bridges Solar (AD1-088) is listed in the PJM interconnection queue as a 54 MW solar project in Mecklenburg County, VA. The filing names Briery-Clover as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 31, 2026.
| Queue ID | AD1-088 |
|---|---|
| Project name | Seven Bridges Solar |
| Status (as published) | Suspended |
| Substation | Briery-Clover |
| Point of interconnection | Briery-Clover 230 kV |
| County | Mecklenburg |
| State | VA |
| Voltage | 230 kV |
| Capacity | 54 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-12-31 |
| Source dataset | serial |
Same substation and county
Briery-Clover substation: 6 requests in the PJM queue, 1 active totaling 54 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AC1-162 | Briery-Clover 230kV | 168.9 | Solar | Withdrawn |
| AG1-176 | Briery-Clover 230 kV | 89.7 | Solar | Withdrawn |
| AG1-098 | Finneywood Solar | 64.2 | Solar | Withdrawn |
| AE2-182 | Seven Bridges Solar | 11.6 | Solar | Withdrawn |
| AD2-200 | Briery-Clover 230 kV | 9.5 | Solar | Withdrawn |
Mecklenburg, VA: 61 requests in the PJM queue, 14 active totaling 990.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 80 |
| MW capacity | 54 |
| MFO | 80 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.