Briery Substation substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Briery Substation as the point of interconnection, all in Prince Edward County, VA.
Target commercial operation date as filed: Dec 2023 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-100 | Briery Substation 29.4kV | 29.4 | 12 | Solar | Withdrawn | Dec 2023 |
| AH2-101 | Briery Substation 29.4kV | 29.4 | 3 | Solar | Withdrawn | Dec 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Prince Edward County, VA
- Madisonville: 1 active, 150 MW of 2 filed
- Briery-Clover: 1 active, 54 MW of 6 filed
- Pamplin: none active of 3 filed
- Briery - Finneywood: none active of 2 filed
- Farmville - Moran DP: none active of 2 filed