1 active project totalling 150 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1099 Madisonville 115 kV 115 150 Hybrid Active
AF2-171 Madisonville 115 kV 115 90 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.