Farmville - Moran DP substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Farmville - Moran DP as the point of interconnection, all in Prince Edward County, VA.
Target commercial operation date as filed: Sep 2026 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI1-145 | Farmville - Moran DP 115 kV | 115 | 75 | Solar | Withdrawn | Sep 2026 |
| AI1-146 | Farmville - Moran DP 115 kV | 115 | 20 | Battery | Withdrawn | Sep 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Prince Edward County, VA
- Madisonville: 1 active, 150 MW of 2 filed
- Briery-Clover: 1 active, 54 MW of 6 filed
- Pamplin: none active of 3 filed
- Briery - Finneywood: none active of 2 filed
- Briery Substation: none active of 2 filed