Pamplin substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Pamplin as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Sep 2019 to Apr 2024 (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AD2-082 Pamplin 34.5kV 34.5 10.1 Solar Withdrawn Sep 2019
AD1-160 Pamplin Solar 34.5 6.6 Solar Withdrawn Dec 2020
AI2-043 Pamplin 34.5kV 34.5 3 Solar Withdrawn Apr 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Pamplin” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Prince Edward County, VA

All 20 PJM queue filings in Prince Edward County, VA.

Other PJM queue substations in Appomattox County, VA

All 7 PJM queue filings in Appomattox County, VA.

Other PJM queue substations in Northumberland County, VA

No other substation in Northumberland County, VA is named as a point of interconnection in the PJM queue.

All 2 PJM queue filings in Northumberland County, VA.