Substation Scout

Pamplin substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AD2-082 Pamplin 34.5kV 34.5 10.1 Solar Withdrawn
AD1-160 Pamplin Solar 34.5 6.6 Solar Withdrawn
AI2-043 Pamplin 34.5kV 34.5 3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.