Prince Edward, VA interconnection queue

8 active projects totalling 416.9 MW in the PJM queue, plus 12 with terminal status (shown greyed).

8active projects
416.9active MW
20total filed
Queue IDProjectkVMWResourceStatus
AC1-162 Briery-Clover 230kV 230 168.9 Solar Withdrawn
C01-1185 Finneywood - Briery 230 kV 230 145.2 Solar Active
AH1-377 Keysville PV I, LLC 230 111.6 Solar Withdrawn
AH1-731 Not reported n/r 107 Battery Withdrawn
AH1-750 Not reported n/r 100 Battery Withdrawn
C01-1367 Curdsville - Willis 115 kV 115 100 Battery Active
C01-2137 Pamplin - Willis 115 kV 115 96.8 Solar Active
AF2-171 Madisonville 115 kV 115 90 Solar Withdrawn
AG1-176 Briery-Clover 230 kV 230 89.7 Solar Withdrawn
AI1-145 Farmville - Moran DP 115 kV 115 75 Solar Withdrawn
AG2-198 Briery - Finneywood 230 kV 230 48 Solar Active
AI1-146 Farmville - Moran DP 115 kV 115 20 Battery Withdrawn
AG2-566 Briery - Finneywood 230 kV 230 12 Battery Active
AH2-005 Pamplin – Willis Tap 115 kV 115 12 Solar Withdrawn
AH2-100 Briery Substation 29.4kV 29.4 12 Solar Withdrawn
AD2-082 Pamplin 34.5kV 34.5 10.1 Solar Withdrawn
C01-1696 Briery 24.94 kV 24.9 9 Solar Active
C01-1161 Pamplin - Madisonville 115 kV 115 3.5 Solar Active
AH2-101 Briery Substation 29.4kV 29.4 3 Solar Withdrawn
C01-1697 Moran 24.94 kV 24.9 2.4 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.