Silver Lake-Cherry Valley substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-096 | Garden Prairie Energy Facility | n/r | 350 | Gas | Withdrawn |
| U3-021 | Garden Prairie Energy Facility | n/r | 100 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.