Blackhawk substation interconnection queue

1 active project totalling 6.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
6.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
R18 Winnebago Energy Center n/r 6.4 Gas In Service
Z2-090 Blackhawk 12.5kV 12.5 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.