Boone, IL interconnection queue

2 active projects totalling 205 MW in the PJM queue, plus 10 with terminal status (shown greyed).

2active projects
205active MW
12total filed
Queue IDProjectkVMWResourceStatus
AB2-096 Garden Prairie Energy Facility n/r 350 Gas Withdrawn
C01-1771 Wempletown - Cherry Valley 345 kV 345 198.6 Wind Active
U3-021 Garden Prairie Energy Facility n/r 100 Gas Withdrawn
AH1-047 Marengo - Belvidere 138 kV 138 37 Solar Withdrawn
T148 Wempletown-Belvidere 138kV 138 20 Wind Withdrawn
T99 Wempletown-Belvidere 138kV 138 20 Wind Withdrawn
AA2-067 Belvidere n/r 10 Gas Withdrawn
N20 Poplar Grove 34kV 34 9.9 Wind Withdrawn
AD1-129 Cherry Valley Solar Project, LLC 34 7.5 Solar Withdrawn
AC2-007 Belvidere n/r 7 Solar Withdrawn
R18 Winnebago Energy Center n/r 6.4 Gas In Service
O07 Boone Heritage WF 34.5 5 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.