Waverly Solar (AD1-082) is listed in the PJM interconnection queue as a 43.3 MW solar project in Sussex County, VA. The filing names Bakers Pond-Ivor as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 16, 2024.
| Queue ID | AD1-082 |
|---|---|
| Project name | Waverly Solar |
| Status (as published) | In Service |
| Substation | Bakers Pond-Ivor |
| Point of interconnection | Bakers Pond-Ivor 115kV |
| County | Sussex |
| State | VA |
| Voltage | 115 kV |
| Capacity | 43.3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-02-16 |
| Source dataset | serial |
Same substation and county
Bakers Pond-Ivor substation: 2 requests in the PJM queue, 1 active totaling 43.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB2-039 | Bakers Pond-Ivor 115kV | 47 | Solar | Withdrawn |
Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 68 |
| MW capacity | 43.3 |
| MFO | 68 |