Waverly Solar

PJM queue ID AD1-082

Waverly Solar (AD1-082) is listed in the PJM interconnection queue as a 43.3 MW solar project in Sussex County, VA. The filing names Bakers Pond-Ivor as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 16, 2024.

Queue IDAD1-082
Project nameWaverly Solar
Status (as published)In Service
SubstationBakers Pond-Ivor
Point of interconnectionBakers Pond-Ivor 115kV
CountySussex
StateVA
Voltage115 kV
Capacity43.3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-02-16
Source datasetserial

Same substation and county

Bakers Pond-Ivor substation: 2 requests in the PJM queue, 1 active totaling 43.3 MW.

Queue IDProjectMWResourceStatus
AB2-039Bakers Pond-Ivor 115kV47SolarWithdrawn

Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy68
MW capacity43.3
MFO68

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.