Gladys DP-Stone Mill substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Gladys DP-Stone Mill as the point of interconnection, all in Campbell County, VA.
Target commercial operation date as filed: Mar 2022 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-275 | Gladys DP-Stone Mill 69 kV | 69 | 12 | Solar | Withdrawn | Mar 2022 |
| AG1-276 | Gladys DP-Stone Mill 69 kV | 69 | 12 | Solar | Withdrawn | Mar 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Campbell County, VA
- Altavista: 2 active, 64 MW of 2 filed
- Grit DP-Perth: 1 active, 61.2 MW of 3 filed
- Smith Mountain-Candler's Mountain: 2 active, 54.4 MW of 2 filed
- Reusens: 1 active, 4 MW of 3 filed
- Gladys DP-Stonemill: 1 active, 0 MW of 2 filed
Site Scanner