Smith Mountain-Candler's Mountain substation interconnection queue

2 active projects totaling 54.4 MW in the PJM queue.

2 PJM queue filings name Smith Mountain-Candler's Mountain as the point of interconnection, all in Campbell County, VA.

Target commercial operation date as filed: Jun 2021 (2 filings).

2active projects
54.4active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC1-122 Altavista Solar 138 40.7 Solar In Service Jun 2021
AC1-123 Altavista Solar 138 13.7 Solar In Service Jun 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Campbell County, VA

All 26 PJM queue filings in Campbell County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first