Smith Mountain-Candler's Mountain substation interconnection queue
2 active projects totaling 54.4 MW in the PJM queue.
2 PJM queue filings name Smith Mountain-Candler's Mountain as the point of interconnection, all in Campbell County, VA.
Target commercial operation date as filed: Jun 2021 (2 filings).
2active projects
54.4active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-122 | Altavista Solar | 138 | 40.7 | Solar | In Service | Jun 2021 |
| AC1-123 | Altavista Solar | 138 | 13.7 | Solar | In Service | Jun 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Campbell County, VA
- Altavista: 2 active, 64 MW of 2 filed
- Grit DP-Perth: 1 active, 61.2 MW of 3 filed
- Reusens: 1 active, 4 MW of 3 filed
- Gladys DP-Stone Mill: none active of 2 filed
- Gladys DP-Stonemill: 1 active, 0 MW of 2 filed