Substation Scout

Reusens substation interconnection queue

1 active project totalling 4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
4active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-202 Reusens 12.47 kV 12.5 20 Battery Withdrawn
AB2-109 Reusens Hydro Electric Generating Plant 34.5 4 Hydro In Service
AA2-001 Reusens 34.5kV 34.5 2 Hydro Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.