Reusens substation interconnection queue
1 active project totalling 4 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-202 | Reusens 12.47 kV | 12.5 | 20 | Battery | Withdrawn |
| AB2-109 | Reusens Hydro Electric Generating Plant | 34.5 | 4 | Hydro | In Service |
| AA2-001 | Reusens 34.5kV | 34.5 | 2 | Hydro | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.