Gladys DP-Stonemill substation interconnection queue
1 active project totaling 0 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Gladys DP-Stonemill as the point of interconnection, all in Campbell County, VA.
Target commercial operation dates as filed run from Dec 2022 to Mar 2031 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (1 filing).
1active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-645 | Gladys DP-Stonemill 69 kV | 69 | 8 | Battery | Withdrawn | Dec 2022 |
| AF2-404 | Pigeon Run Solar and Storage | 69 | 0 | Battery | EP | Mar 2031 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Campbell County, VA
- Altavista: 2 active, 64 MW of 2 filed
- Grit DP-Perth: 1 active, 61.2 MW of 3 filed
- Smith Mountain-Candler's Mountain: 2 active, 54.4 MW of 2 filed
- Reusens: 1 active, 4 MW of 3 filed
- Gladys DP-Stone Mill: none active of 2 filed