Substation Scout

Pruntytown substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W2-005 Pruntytown 138kV 138 30 Hydro Withdrawn
X2-008 Pruntytown 138kV 138 30 Hydro Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.