Pickens substation interconnection queue
1 active project totalling 111.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
111.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2153 | Pickens 138 kV | 138 | 111.2 | Wind | Active |
| V3-027 | Pickens 138kV | 138 | 26 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.