Pickens substation interconnection queue

1 active project totalling 111.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
111.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-2153 Pickens 138 kV 138 111.2 Wind Active
V3-027 Pickens 138kV 138 26 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.