Springboro-Venango Junction substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Springboro-Venango Junction as the point of interconnection, all in Crawford County, PA.

Target commercial operation dates as filed run from Dec 2022 to Feb 2023 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-170 Springboro-Venango Junction 115 kV 115 46.5 Solar Withdrawn Feb 2023
AG1-455 Springboro-Venango Junction 115 kV 115 35 Battery Withdrawn Dec 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Crawford County, PA

All 56 PJM queue filings in Crawford County, PA.