Substation Scout

Union City-Cambridge Springs substation interconnection queue

1 active project totaling 12 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Union City-Cambridge Springs as the point of interconnection, all in Crawford County, PA.

Target commercial operation dates as filed run from Jan 2023 to Dec 2026 (2 filings). 1 active filing targets a date after November 27, 2026.

1active projects
12active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-094 Franklin Solar 34.5 12 Solar Under Construction Dec 2026
AF2-237 Union City-Cambridge Springs 34.5 kV 34.5 6 Solar Withdrawn Jan 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Crawford County, PA

All 56 PJM queue filings in Crawford County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first