Union City-Cambridge Springs substation interconnection queue
1 active project totalling 12 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
12active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-094 | Franklin Solar | 34.5 | 12 | Solar | Under Construction |
| AF2-237 | Union City-Cambridge Springs 34.5 kV | 34.5 | 6 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.