Substation Scout

Union City-Cambridge Springs substation interconnection queue

1 active project totalling 12 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
12active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF1-094 Franklin Solar 34.5 12 Solar Under Construction
AF2-237 Union City-Cambridge Springs 34.5 kV 34.5 6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.