Union City-Cambridge Springs substation interconnection queue
1 active project totaling 12 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Union City-Cambridge Springs as the point of interconnection, all in Crawford County, PA.
Target commercial operation dates as filed run from Jan 2023 to Dec 2026 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
12active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-094 | Franklin Solar | 34.5 | 12 | Solar | Under Construction | Dec 2026 |
| AF2-237 | Union City-Cambridge Springs 34.5 kV | 34.5 | 6 | Solar | Withdrawn | Jan 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Crawford County, PA
- Erie West: 1 active, 1,100 MW of 7 filed
- Wayne: 1 active, 530 MW of 4 filed
- Geneva: 2 active, 35.5 MW of 6 filed
- Morgan Street-Cochranton: 1 active, 9 MW of 2 filed
- Union City: 2 active, 8.9 MW of 6 filed
- Crawford: none active of 3 filed
- Titusville: none active of 3 filed
- Conneaut-Conneaut Tap: none active of 2 filed
- Corry East: none active of 2 filed
- Jamestown-Hartstown: none active of 2 filed
- Springboro-Venango Junction: none active of 2 filed
- Titusville-Oil Creek: none active of 2 filed