Wayne substation interconnection queue

2 active projects totalling 626.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
626.4active MW
4total filed
Queue IDProjectkVMWResourceStatus
C01-1550 Wayne 345 kV 345 530 Battery Active
C01-1544 Wayne 345 kV 345 96.4 Solar Active
AF1-055 Wayne 115 kV 115 41.7 Solar Withdrawn
AE2-178 Wayne 115 kV 115 37.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.