Union City substation interconnection queue

2 active projects totaling 8.9 MW in the PJM queue, plus 4 with terminal status (shown grayed).

6 PJM queue filings name Union City as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Jun 2007 to Oct 2028 (6 filings).

Transmission owner as filed: PENELEC (2 filings).

2active projects
8.9active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
M15 Union City 230kV 230 301.5 Gas Withdrawn Jun 2007
AG1-177 Union City 34.5 kV 34.5 12 Solar Withdrawn Mar 2024
AH1-491 Waterford Solar 1 34.5 12 Solar Withdrawn Oct 2028
AG1-198 Union City 34.5 kV 34.5 7.2 Solar In Service Dec 2025
AG2-438 Union City 34.5 kV 34.5 6.7 Solar Withdrawn Feb 2028
AG1-140 Great Lake Growers 34.5 1.7 Solar Suspended Dec 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Erie County, PA

All 42 PJM queue filings in Erie County, PA.

Other PJM queue substations in Crawford County, PA

All 56 PJM queue filings in Crawford County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first