Substation Scout

Union City substation interconnection queue

2 active projects totalling 8.9 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
8.9active MW
6total filed
Queue IDProjectkVMWResourceStatus
M15 Union City 230kV 230 301.5 Gas Withdrawn
AG1-177 Union City 34.5 kV 34.5 12 Solar Withdrawn
AH1-491 Waterford Solar 1 34.5 12 Solar Withdrawn
AG1-198 Union City 34.5 kV 34.5 7.2 Solar In Service
AG2-438 Union City 34.5 kV 34.5 6.7 Solar Withdrawn
AG1-140 Great Lake Growers 34.5 1.7 Solar Suspended

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.