Union City substation interconnection queue
2 active projects totalling 8.9 MW in the PJM queue, plus 4 with terminal status (shown greyed).
2active projects
8.9active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| M15 | Union City 230kV | 230 | 301.5 | Gas | Withdrawn |
| AG1-177 | Union City 34.5 kV | 34.5 | 12 | Solar | Withdrawn |
| AH1-491 | Waterford Solar 1 | 34.5 | 12 | Solar | Withdrawn |
| AG1-198 | Union City 34.5 kV | 34.5 | 7.2 | Solar | In Service |
| AG2-438 | Union City 34.5 kV | 34.5 | 6.7 | Solar | Withdrawn |
| AG1-140 | Great Lake Growers | 34.5 | 1.7 | Solar | Suspended |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.