Erie West substation interconnection queue

1 active project totaling 1,100 MW in the PJM queue, plus 6 with terminal status (shown grayed).

7 PJM queue filings name Erie West as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Jun 2004 to Dec 2031 (6 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: PENELEC (1 filing).

1active projects
1,100active MW
7total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-2241 Erie West 345 kV 345 1,100 Not reported Active Dec 2031
G00_MTX3 Erie West 345kV 345 1,000 Not reported Withdrawn Jun 2004
Y3-092 ITC Lake Erie Connector 345 1,000 Not reported Withdrawn Mar 2024
Y3-093 Erie West 345kV 345 1,000 Not reported Withdrawn Jan 2017
A38 Erie West 345 kV 345 765 Gas Withdrawn n/r
AB2-019 Erie West 345kV 345 28 Not reported Withdrawn Mar 2024
AF1-104 Elder West 34.5 20 Hybrid Withdrawn Oct 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Erie West (PENELEC, 5 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Erie County, PA

All 42 PJM queue filings in Erie County, PA.

Other PJM queue substations in Crawford County, PA

All 56 PJM queue filings in Crawford County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first