Erie West substation interconnection queue

1 active project totalling 1,100 MW in the PJM queue, plus 6 with terminal status (shown greyed).

1active projects
1,100active MW
7total filed
Queue IDProjectkVMWResourceStatus
C01-2241 Erie West 345 kV 345 1,100 Not reported Active
G00_MTX3 Erie West 345kV 345 1,000 Not reported Withdrawn
Y3-092 ITC Lake Erie Connector 345 1,000 Not reported Withdrawn
Y3-093 Erie West 345kV 345 1,000 Not reported Withdrawn
A38 Erie West 345 kV 345 765 Gas Withdrawn
AB2-019 Erie West 345kV 345 28 Not reported Withdrawn
AF1-104 Elder West 34.5 20 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.