Morgan Street-Cochranton substation interconnection queue
1 active project totaling 9 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Morgan Street-Cochranton as the point of interconnection, all in Crawford County, PA.
Target commercial operation dates as filed run from Jan 2023 to Mar 2026 (2 filings).
1active projects
9active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-197 | Morgan Street-Cochranton 34.5 kV | 34.5 | 9 | Solar | Suspended | Mar 2026 |
| AG2-167 | Morgan Street-Cochranton 34.5 kV | 34.5 | 3 | Solar | Withdrawn | Jan 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Crawford County, PA
- Erie West: 1 active, 1,100 MW of 7 filed
- Wayne: 1 active, 530 MW of 4 filed
- Geneva: 2 active, 35.5 MW of 6 filed
- Union City-Cambridge Springs: 1 active, 12 MW of 2 filed
- Union City: 2 active, 8.9 MW of 6 filed
- Crawford: none active of 3 filed
- Titusville: none active of 3 filed
- Conneaut-Conneaut Tap: none active of 2 filed
- Corry East: none active of 2 filed
- Jamestown-Hartstown: none active of 2 filed
- Springboro-Venango Junction: none active of 2 filed
- Titusville-Oil Creek: none active of 2 filed
Site Scanner