Jamestown-Hartstown substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF1-171 Jamestown-Hartstown 69 kV 69 12 Solar Withdrawn
AF2-236 Jamestown-Hartstown 69 kV 69 4.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.