Substation Scout

Jamestown-Hartstown substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF1-171 Jamestown-Hartstown 69 kV 69 12 Solar Withdrawn
AF2-236 Jamestown-Hartstown 69 kV 69 4.8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.