Geneva substation interconnection queue

3 active projects totalling 125.5 MW in the PJM queue, plus 3 with terminal status (shown greyed).

3active projects
125.5active MW
6total filed
Queue IDProjectkVMWResourceStatus
X3-039 Geneva 115kV 115 96 Other Withdrawn
AG2-176 Geneva 115 kV 115 90 Solar Active
AF2-051 Geneva 115 kV 115 33 Solar Withdrawn
L13_CE25 City of Geneva Units 1-5 n/r 29 Gas In Service
AG1-303 Victory Solar 115 26.4 Solar Withdrawn
Y1-012 Geneva Renewable Energy Facility n/r 6.5 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.