Geneva substation interconnection queue

2 active projects totalling 35.5 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
35.5active MW
6total filed
Queue IDProjectkVMWResourceStatus
X3-039 Geneva 115kV 115 96 Other Withdrawn
AG2-176 Geneva 115 kV 115 90 Solar Withdrawn
AF2-051 Geneva 115 kV 115 33 Solar Withdrawn
L13_CE25 City of Geneva Units 1-5 n/r 29 Gas In Service
AG1-303 Victory Solar 115 26.4 Solar Withdrawn
Y1-012 Geneva Renewable Energy Facility n/r 6.5 Gas In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.