Geneva substation interconnection queue
2 active projects totaling 35.5 MW in the PJM queue, plus 4 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jun 2005 to Dec 2029 (6 filings).
Transmission owner as filed: PENELEC (1 filing).
2active projects
35.5active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| X3-039 | Geneva 115kV | 115 | 96 | Other | Withdrawn | Jul 2014 |
| AG2-176 | Geneva 115 kV | 115 | 90 | Solar | Withdrawn | Dec 2029 |
| AF2-051 | Geneva 115 kV | 115 | 33 | Solar | Withdrawn | Jun 2023 |
| L13_CE25 | City of Geneva Units 1-5 | n/r | 29 | Gas | In Service | Jun 2005 |
| AG1-303 | Victory Solar | 115 | 26.4 | Solar | Withdrawn | Jun 2026 |
| Y1-012 | Geneva Renewable Energy Facility | n/r | 6.5 | Gas | In Service | Aug 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AG2-176 | Terminal status | 90 | Active → Withdrawn |
Other PJM queue substations in Crawford County, PA
- Erie West: 1 active, 1,100 MW of 7 filed
- Wayne: 1 active, 530 MW of 4 filed
- Union City-Cambridge Springs: 1 active, 12 MW of 2 filed
- Morgan Street-Cochranton: 1 active, 9 MW of 2 filed
- Union City: 2 active, 8.9 MW of 6 filed
- Crawford: none active of 3 filed
- Titusville: none active of 3 filed
- Conneaut-Conneaut Tap: none active of 2 filed
- Corry East: none active of 2 filed
- Jamestown-Hartstown: none active of 2 filed
- Springboro-Venango Junction: none active of 2 filed
- Titusville-Oil Creek: none active of 2 filed
Other PJM queue substations in Kane County, IL
- Elgin: 1 active, 16 MW of 2 filed
- Rocky Road: none active of 3 filed
- West Rutland: none active of 2 filed
Other PJM queue substations in Ashtabula County, OH
- Erie West - Ashtabula: none active of 2 filed