Geneva substation interconnection queue

2 active projects totaling 35.5 MW in the PJM queue, plus 4 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jun 2005 to Dec 2029 (6 filings).

Transmission owner as filed: PENELEC (1 filing).

2active projects
35.5active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
X3-039 Geneva 115kV 115 96 Other Withdrawn Jul 2014
AG2-176 Geneva 115 kV 115 90 Solar Withdrawn Dec 2029
AF2-051 Geneva 115 kV 115 33 Solar Withdrawn Jun 2023
L13_CE25 City of Geneva Units 1-5 n/r 29 Gas In Service Jun 2005
AG1-303 Victory Solar 115 26.4 Solar Withdrawn Jun 2026
Y1-012 Geneva Renewable Energy Facility n/r 6.5 Gas In Service Aug 2013

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05AG2-176Terminal status90 Active → Withdrawn

Other PJM queue substations in Crawford County, PA

All 56 PJM queue filings in Crawford County, PA.

Other PJM queue substations in Kane County, IL

All 11 PJM queue filings in Kane County, IL.

Other PJM queue substations in Ashtabula County, OH

All 9 PJM queue filings in Ashtabula County, OH.