Geneva substation interconnection queue
3 active projects totalling 125.5 MW in the PJM queue, plus 3 with terminal status (shown greyed).
3active projects
125.5active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| X3-039 | Geneva 115kV | 115 | 96 | Other | Withdrawn |
| AG2-176 | Geneva 115 kV | 115 | 90 | Solar | Active |
| AF2-051 | Geneva 115 kV | 115 | 33 | Solar | Withdrawn |
| L13_CE25 | City of Geneva Units 1-5 | n/r | 29 | Gas | In Service |
| AG1-303 | Victory Solar | 115 | 26.4 | Solar | Withdrawn |
| Y1-012 | Geneva Renewable Energy Facility | n/r | 6.5 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.