Substation Scout

Conneaut-Conneaut Tap substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-159 ASD Carmen PA2 Solar 69 13.9 Solar Withdrawn
AG1-331 Conneaut-Conneaut Tap 69 kV 69 4.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.