Conneaut-Conneaut Tap substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Conneaut-Conneaut Tap as the point of interconnection, all in Crawford County, PA.
Target commercial operation dates as filed run from Jul 2022 to Nov 2023 (2 filings).
Transmission owner as filed: ATSI (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-159 | ASD Carmen PA2 Solar | 69 | 13.9 | Solar | Withdrawn | Nov 2023 |
| AG1-331 | Conneaut-Conneaut Tap 69 kV | 69 | 4.4 | Solar | Withdrawn | Jul 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Crawford County, PA
- Erie West: 1 active, 1,100 MW of 7 filed
- Wayne: 1 active, 530 MW of 4 filed
- Geneva: 2 active, 35.5 MW of 6 filed
- Union City-Cambridge Springs: 1 active, 12 MW of 2 filed
- Morgan Street-Cochranton: 1 active, 9 MW of 2 filed
- Union City: 2 active, 8.9 MW of 6 filed
- Crawford: none active of 3 filed
- Titusville: none active of 3 filed
- Corry East: none active of 2 filed
- Jamestown-Hartstown: none active of 2 filed
- Springboro-Venango Junction: none active of 2 filed
- Titusville-Oil Creek: none active of 2 filed