Conneaut-Conneaut Tap substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-159 | ASD Carmen PA2 Solar | 69 | 13.9 | Solar | Withdrawn |
| AG1-331 | Conneaut-Conneaut Tap 69 kV | 69 | 4.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.