Substation Scout

Lake, IL interconnection queue

7 active projects totalling 1,360 MW in the PJM queue, plus 13 with terminal status (shown greyed).

7active projects
1,360active MW
20total filed
Queue IDProjectkVMWResourceStatus
S55 Zion Energy Center 345 495 Gas In Service
Y2-103 Zion Energy Center n/r 360 Gas Withdrawn
AJ1-012 Waukegan Unit 8 CIR Transfer n/r 354.4 Battery Withdrawn
AJ1-011 Waukegan Unit 7 CIR Transfer n/r 328 Battery Withdrawn
C01-1782 Wilson Road 138 kV 138 310 Battery Active
C01-1388 Zion - Lakeview 138 kV 138 245 Battery Active
X2-019 Silver Lake 345kV 345 180 Gas Withdrawn
C01-1573 Zion 345 kV 345 150 Battery Active
AA1-030 Zion-Zion Energy Center n/r 133 Not reported Withdrawn
Y3-013 Zion Energy Center n/r 90 Gas In Service
C01-1574 Zion 345 kV 345 50 Battery Active
AF2-027 Zion Energy Center - BESS 345 20 Battery Engineering and Procurement
C01-1045 RL Beach 138 kV 138 20 Battery Withdrawn
AH1-045 Zion Energy Center 345 kV 345 13.8 Solar Withdrawn
AH1-190 Waukegan 138 kV 138 10 Battery Withdrawn
W4-082 Countryside Landfill 12 8 Gas Deactivated
AB1-079 Zion 12kV 12 6.5 Gas Withdrawn
Q29 Zion 12kV 12 5.4 Gas Withdrawn
V3-060 Antioch n/r 2.6 Wind Withdrawn
AE1-204 Waukegan 13 kV 13 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.