Substation Scout

Zion substation interconnection queue

3 active projects totalling 695 MW in the PJM queue, plus 2 with terminal status (shown greyed).

3active projects
695active MW
5total filed
Queue IDProjectkVMWResourceStatus
S55 Zion Energy Center 345 495 Gas In Service
C01-1573 Zion 345 kV 345 150 Battery Active
C01-1574 Zion 345 kV 345 50 Battery Active
AB1-079 Zion 12kV 12 6.5 Gas Withdrawn
Q29 Zion 12kV 12 5.4 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.