Zion Energy Center substation interconnection queue

2 active projects totalling 110 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
110active MW
4total filed
Queue IDProjectkVMWResourceStatus
Y2-103 Zion Energy Center n/r 360 Gas Withdrawn
Y3-013 Zion Energy Center n/r 90 Gas In Service
AF2-027 Zion Energy Center - BESS 345 20 Battery Engineering and Procurement
AH1-045 Zion Energy Center 345 kV 345 13.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.