Substation Scout

Pittsgrove substation interconnection queue

1 active project totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W4-056 Pittsgrove 12kV 12 0.8 Solar Withdrawn
V2-035 Pittsgrove Solar, LLC n/r 0 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.