Pittsgrove Solar, LLC
PJM queue ID V2-035
Pittsgrove Solar, LLC (V2-035) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Salem County, NJ. The filing names Pittsgrove as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of April 14, 2014.
| Queue ID | V2-035 |
|---|---|
| Project name | Pittsgrove Solar, LLC |
| Status (as published) | In Service |
| Substation | Pittsgrove |
| Point of interconnection | Pittsgrove |
| County | Salem |
| State | NJ |
| Voltage | Not reported |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2014-04-14 |
| Source dataset | serial |
Same substation and county
Pittsgrove substation: 2 requests in the PJM queue, 1 active totaling 0 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| W4-056 | Pittsgrove 12kV | 0.8 | Solar | Withdrawn |
Salem, NJ: 114 requests in the PJM queue, 13 active totaling 906.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 2 |
| MW capacity | 0 |
| MFO | 2 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.