South Dixon Solar
PJM queue ID AF1-280
South Dixon Solar (AF1-280) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Lee County, IL. The filing names Nelson-Lee County as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of December 31, 2029.
| Queue ID | AF1-280 |
|---|---|
| Project name | South Dixon Solar |
| Status (as published) | EP |
| Substation | Nelson-Lee County |
| Point of interconnection | Nelson-Lee County |
| County | Lee |
| State | IL |
| Voltage | Not reported |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | cycle |
Same substation and county
Nelson-Lee County substation: 4 requests in the PJM queue, 1 active totaling 0 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH2-122 | Nelson-Lee County 345 kV | 100 | Battery | Withdrawn |
| AF2-183 | Nelson-Lee County 345 kV | 32 | Battery | Withdrawn |
| AF1-281 | Nelson-Lee County | 3 | Battery | Withdrawn |
Lee, IL: 106 requests in the PJM queue, 30 active totaling 2,565.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Deriva Energy Solar, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 200.0 |
| MW capacity | 0.0 |
| MFO | 200.0 |
| Submitted date | 9/10/2019 |
| Last updated | 5/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.