Substation Scout

South Dixon Solar

PJM queue ID AF1-280

South Dixon Solar (AF1-280) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Lee County, IL. The filing names Nelson-Lee County as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of December 31, 2029.

Queue IDAF1-280
Project nameSouth Dixon Solar
Status (as published)EP
SubstationNelson-Lee County
Point of interconnectionNelson-Lee County
CountyLee
StateIL
VoltageNot reported
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-12-31
Source datasetcycle

Same substation and county

Nelson-Lee County substation: 4 requests in the PJM queue, 1 active totaling 0 MW.

Queue IDProjectMWResourceStatus
AH2-122Nelson-Lee County 345 kV100BatteryWithdrawn
AF2-183Nelson-Lee County 345 kV32BatteryWithdrawn
AF1-281Nelson-Lee County3BatteryWithdrawn

Lee, IL: 106 requests in the PJM queue, 30 active totaling 2,565.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperDeriva Energy Solar, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy200.0
MW capacity0.0
MFO200.0
Submitted date9/10/2019
Last updated5/18/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first