Mickleton 69 kV
PJM queue ID C01-1010
Mickleton 69 kV (C01-1010) is listed in the PJM interconnection queue as a 56.3 MW battery project in Gloucester County, NJ. The filing names Mickleton as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 31, 2030.
| Queue ID | C01-1010 |
|---|---|
| Project name | Mickleton 69 kV |
| Status (as published) | Active |
| Substation | Mickleton |
| Point of interconnection | Mickleton 69 kV |
| County | Gloucester |
| State | NJ |
| Voltage | 69 kV |
| Capacity | 56.3 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-08-31 |
| Source dataset | cycle |
Same substation and county
Mickleton substation: 12 requests in the PJM queue, 4 active totaling 729.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Q90 | West Deptford Energy Station | 650 | Gas | In Service |
| T59 | Mickleton | 14.4 | Gas | In Service |
| Z2-083 | West Deptford Energy Station | 9 | Gas | In Service |
| A13 | Mantua Creek Generating Station | 803 | Gas | Withdrawn |
| P13 | Mickleton 230kV | 600 | Gas | Withdrawn |
| S107 | Mickleton 230kV | 520 | Gas | Withdrawn |
| T123 | Mickleton 230kV | 440 | Gas | Withdrawn |
| AC1-135 | Mickleton 230kV | 62 | Gas | Withdrawn |
| AF2-024 | Mickleton Battery Storage | 9.6 | Battery | Withdrawn |
| W1-081 | Mickleton 12kV | 1.9 | Solar | Withdrawn |
| AA1-104 | Mickleton 230kV | 0 | Battery | Withdrawn |
Gloucester, NJ: 88 requests in the PJM queue, 22 active totaling 1,788.6 MW.
A substation with the same name is named in PJM transmission planning materials: Mickleton (ACE, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Calpine Mid-Atlantic Development, LLC |
|---|---|
| Transmission owner | AEC |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 56.3 |
| MW capacity | 56.3 |
| MFO | 56.3 |
| Submitted date | 5/29/2025 |
| Last updated | 6/25/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.