Substation Scout

West Deptford Energy Station

PJM queue ID Z2-083

West Deptford Energy Station (Z2-083) is listed in the PJM interconnection queue as a 9 MW gas project in Gloucester County, NJ. The filing names Mickleton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2018.

Queue IDZ2-083
Project nameWest Deptford Energy Station
Status (as published)In Service
SubstationMickleton
Point of interconnectionMickleton 230kV
CountyGloucester
StateNJ
Voltage230 kV
Capacity9 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2018-12-31
Source datasetserial

Same substation and county

Mickleton substation: 12 requests in the PJM queue, 4 active totaling 729.7 MW.

Queue IDProjectMWResourceStatus
Q90West Deptford Energy Station650GasIn Service
C01-1010Mickleton 69 kV56.3BatteryActive
T59Mickleton14.4GasIn Service
A13Mantua Creek Generating Station803GasWithdrawn
P13Mickleton 230kV600GasWithdrawn
S107Mickleton 230kV520GasWithdrawn
T123Mickleton 230kV440GasWithdrawn
AC1-135Mickleton 230kV62GasWithdrawn
AF2-024Mickleton Battery Storage9.6BatteryWithdrawn
W1-081Mickleton 12kV1.9SolarWithdrawn
AA1-104Mickleton 230kV0BatteryWithdrawn

Gloucester, NJ: 88 requests in the PJM queue, 22 active totaling 1,788.6 MW.

A substation with the same name is named in PJM transmission planning materials: Mickleton (ACE, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy9
MW capacity9
MFO1104

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first