Wheatland substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-505 | Wheatland 12.47 kV | 12.5 | 5 | Solar | Withdrawn |
| AG1-335 | Wheatland 12.47 kV | 12.5 | 2.7 | Solar | Withdrawn |
| AE1-029 | Wheatland 12 kV | 12 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.