Mercer 230 kV
PJM queue ID C01-1327
Mercer 230 kV (C01-1327) is listed in the PJM interconnection queue as a 100 MW battery project in Mercer County, NJ. The filing names Mercer as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2029.
| Queue ID | C01-1327 |
|---|---|
| Project name | Mercer 230 kV |
| Status (as published) | Active |
| Substation | Mercer |
| Point of interconnection | Mercer 230 kV |
| County | Mercer |
| State | NJ |
| Voltage | 230 kV |
| Capacity | 100 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-06-01 |
| Source dataset | cycle |
Same substation and county
Mercer substation: 5 requests in the PJM queue, 2 active totaling 180 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-237 | Lamberton Road Battery | 80 | Battery | Engineering and Procurement |
| D26 | Mercer 230kV | 550 | Gas | Withdrawn |
| AI2-469 | Mercer 12.5 kV | 5.8 | Solar | Withdrawn |
| AI2-470 | Mercer 12.5 kV | 5.8 | Solar | Withdrawn |
Mercer, NJ: 28 requests in the PJM queue, 8 active totaling 183.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Baywell Energy, LLC |
|---|---|
| Transmission owner | PSEG |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 100.0 |
| MW capacity | 100.0 |
| MFO | 180.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/22/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.