Substation Scout

Mercer 230 kV

PJM queue ID C01-1327

Mercer 230 kV (C01-1327) is listed in the PJM interconnection queue as a 100 MW battery project in Mercer County, NJ. The filing names Mercer as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2029.

Queue IDC01-1327
Project nameMercer 230 kV
Status (as published)Active
SubstationMercer
Point of interconnectionMercer 230 kV
CountyMercer
StateNJ
Voltage230 kV
Capacity100 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-06-01
Source datasetcycle

Same substation and county

Mercer substation: 5 requests in the PJM queue, 2 active totaling 180 MW.

Queue IDProjectMWResourceStatus
AF1-237Lamberton Road Battery80BatteryEngineering and Procurement
D26Mercer 230kV550GasWithdrawn
AI2-469Mercer 12.5 kV5.8SolarWithdrawn
AI2-470Mercer 12.5 kV5.8SolarWithdrawn

Mercer, NJ: 28 requests in the PJM queue, 8 active totaling 183.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperBaywell Energy, LLC
Transmission ownerPSEG
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy100.0
MW capacity100.0
MFO180.0
Submitted date4/27/2026
Last updated6/22/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first